Estimated Project Cost: $1,000,000- $1,700,000
Contract Working Days: 110
This project consists of the construction of the new Northshore Lift Station followed by the decommissioning of the existing Sage Bay Lift Station and the existing temporary Northshore Lift Station. The new lift station construction will include a 120-inch diameter precast concrete wet well, three submersible pumps, valve vault, flow meter, wet well ventilation and biofilter, air release valve, electrical equipment and panels, pump controls, VFD’s telemetry equipment, standby generator, about 700 total linear feet of various diameters of gravity sewer main, seven new manholes, 4 inch side sewer connections, about 110 linear feet of 10 inch diameter force main, about 255 linear feet of 6 inch diameter C900 PVC water main, gate valves, concrete block retaining wall, traffic control, wastewater bypass pumping, and other miscellaneous work and material. Decommissioning the two existing lift stations will include the removal or abandoning of lift station equipment, repaving a Cul-de-sac, HMA patch, and sidewalk replacement.